Skip to main content

Olathe remodeling / Basement Remodel

Olathe Basement Remodel with Projector Theater and Guest Suite

This Olathe basement remodel transformed a builder-grade open lower level into a finished space with a projector theater for movie nights and sports, a pool table, home gym, wet bar, new floors, new appliances, remodeled bathroom with a tub-shower combination, and an upstairs pink guest suite.

PROJECT SNAPSHOT

A builder-grade basement turned into a full lower-level retreat

This 12-week remodel gave the homeowners a finished basement for movie nights, sports, pool, workouts, drinks, and guests, then carried the refresh upstairs with a soft pink guest suite and pendant light.

Location
Olathe, KS
Project type
Full basement remodel with upstairs guest suite refresh
Timeline
12 weeks
Main spaces
Projector theater, pool table area, wet bar, home gym, remodeled basement bathroom, and upstairs guest suite
Design goal
Turn a large builder-grade basement into defined entertaining, fitness, and guest-ready spaces without losing the open layout

CASE STUDY

The project story

A closer look at the scope, constraints, and design decisions behind Olathe Basement Remodel with Projector Theater and Guest Suite.

PROJECT SCOPE

A full basement remodel, plus an upstairs guest suite

This Olathe project started with a basement that had plenty of square footage but not enough intention. It was a large, open, builder-grade lower level: usable, but not especially warm, polished, or tailored to the way the homeowners wanted to live. Built by Design remodeled the basement so it could support movie nights, sports games, pool, drinks with friends, workouts, and overnight guests.

The basement scope included a projector theater with a large screen, a pool table area, a home gym, a wet bar, new appliances, new flooring, a remodeled bathroom, and better lighting throughout the lower level. The bathroom was updated with a tub-shower combination, which gives the space dual use for a quick shower or a full bath. The project also included a refresh upstairs, where an existing bedroom became a charming guest suite with soft pink walls, a black metal bed, layered textiles, window treatments, and a statement pendant light.

The finished basement keeps the openness that made the original space useful, but it doesn't feel builder-grade anymore. Warm wood posts, exposed-style beams, a tile theater wall, a projector screen, wood bar cabinetry, patterned bathroom details, display shelving, and new flooring give the lower level a real identity. The upstairs guest suite adds a softer finishing note, making the home feel more ready for family and visitors from top to bottom.

DESIGN CHALLENGE

Give a big open basement structure without closing it down

The biggest challenge was turning one large open room into several useful zones without making the basement feel chopped up. The homeowners wanted a theater area, pool table, wet bar, gym, bathroom, and entertaining space, but the lower level still needed to feel connected. Too many walls would've made the basement smaller and less flexible. Too little definition would've left it feeling like the same builder-grade open space with new furniture.

The theater was a major planning piece. A projector setup needs the right sight line, enough seating distance, a screen wall, ceiling-mounted equipment, and lighting that can support both movie nights and sports games. At the same time, the theater needed to share the basement with the pool table and bar. It had to feel like a destination without turning the entire basement into one single-purpose media room.

The bathroom and gym added another layer of coordination. The bathroom needed to function for family, guests, and anyone using the basement, which made the tub-shower combination a practical choice. The gym needed durable flooring, clear space around equipment, and enough separation from the lounge that workouts felt comfortable. The challenge was making each space useful while keeping the lower level relaxed and easy to move through.

THE SOLUTION

Defined zones for movies, games, workouts, and drinks

Built by Design solved the layout by using the existing openness as an advantage. Instead of breaking the basement into a series of closed rooms, the remodel created visual zones with flooring, lighting, furniture placement, built-in features, and material changes. The pool table sits in the center of the entertaining area, close to the wet bar and within view of the theater. That keeps game nights social and lets people move easily between a drink, a seat, and a turn at the table.

The projector theater anchors the lounge side of the basement. A large projector screen sits over a fireplace feature wall, with the projector mounted at the ceiling behind the seating. Leather lounge furniture, side lighting, and the screen wall make this area feel ready for movies and sports, but the open layout keeps it connected to the rest of the lower level. Someone can be at the bar, someone can be playing pool, and others can be watching the game without the room feeling divided.

The wet bar supports the entertaining plan with natural wood cabinetry, a sink, drink refrigeration, new appliances, counter space, tile backsplash, and lit display shelving for glassware. It gives the basement a practical serving zone, which means drinks and snacks can stay downstairs during gatherings. The wood cabinetry and darker hardware also connect visually to the wood posts and beams, so the bar feels like part of the room rather than an appliance wall dropped into it.

The home gym became a dedicated fitness space with rubber flooring, workout equipment, a treadmill, bench, accent wall, and natural light. It's separate enough to work as a gym, but it still belongs to the finished lower level. Together, the theater, pool area, wet bar, gym, and bathroom make the basement feel fully planned instead of just finished.

BATHROOM AND GUEST SUITE

A practical basement bath and a soft upstairs guest room

The basement bathroom was remodeled with both function and personality in mind. The tub-shower combination gives guests and family more flexibility than a shower-only setup. White tile keeps the bathing area clean and bright, while the vanity side of the room adds the character: a dark vanity, marble-look counter, round gold mirror, black-and-white floral wallcovering, beadboard wainscoting, patterned floor tile, wall sconces, and wood storage shelves.

Those details matter because basement bathrooms can easily feel secondary. This one doesn't. The mixed textures, storage shelves, patterned floor, and wallcovering make it feel designed, while the tub-shower combo keeps it practical for real use. It works for overnight guests, kids, family, and anyone spending time downstairs during a movie night or party.

The upstairs bedroom refresh turned a standard bedroom into a sweet guest suite. Soft pink walls, a pendant light, a black metal bed, layered bedding, window shades, a patterned chair, and simple wall art make the room feel welcoming without overcomplicating it. It gives guests a finished place to stay, which connects nicely to the basement remodel below: the home gained better hosting spaces in more than one area.

MATERIALS AND FEEL

Warm wood, patterned details, and theater-ready comfort

The finished basement uses a warmer, more collected palette than a typical builder-grade lower level. New wood-look flooring runs through the main spaces and gives the basement continuity. Stained wood posts and beams add texture, while the wet bar cabinetry brings in a natural wood tone that feels connected to the rest of the room. The theater wall uses tile and wood framing to give the projector screen a strong background.

Lighting helps each zone feel intentional. The pool table area has a statement light, the theater has sconces and a ceiling-mounted projector, the wet bar has display lighting and task lighting, and the bathroom uses sconces to highlight the vanity wall. The upstairs guest suite adds another layer of personality with its pendant light, soft pink walls, and calm textiles.

The final result feels much more custom than the original open basement. It still has room to breathe, but now every area has a reason to exist. The homeowners can host a sports night, watch a movie, play pool, work out, serve drinks, or welcome guests without the lower level feeling like an afterthought.

MATERIALS AND FINISHES

Finish choices visible throughout the remodeled spaces

The remodel uses new wood-look flooring, stained wood posts and beams, natural wood wet bar cabinetry, drink refrigeration, new appliances, tile backsplash, projector screen, fireplace feature wall, rubber gym flooring, bathroom wallcovering, patterned tile, beadboard wainscoting, and the pink guest suite finishes.

The basement mixes rugged and polished details. Wood, tile, leather seating, black accents, and warm lighting make the lower level feel substantial, while the bathroom and upstairs guest suite bring in more pattern, softness, and color.

  • Large projector screen with ceiling-mounted projector for movies and sports
  • Fireplace theater wall with tile surround and stained wood framing
  • Pool table area with statement lighting and open sight lines to the bar and theater
  • Natural wood wet bar cabinetry with black pulls and stone-look counters
  • Wet bar sink, drink fridge, new appliances, tile backsplash, and lit glass display shelves
  • New wood-look flooring through the main basement gathering areas
  • Home gym with rubber flooring, treadmill, bench, equipment, and accent wall
  • Basement bathroom tub-shower combination with white tile
  • Dark vanity, marble-look counter, round gold mirror, floral wallcovering, beadboard, and patterned floor tile
  • Upstairs guest suite with pink walls, black metal bed, window shades, layered bedding, patterned chair, and pendant light

TIMELINE

A 12-week remodel from builder-grade basement to guest-ready retreat

This project took 12 weeks. The schedule included basement layout planning, new floors, wet bar and appliance work, projector theater installation, bathroom remodeling, gym finishes, and the upstairs guest suite refresh.

  1. Weeks 1-2

    Site protection, demolition, layout confirmation, and planning for the theater, projector, pool table, wet bar, gym, bathroom, and upstairs guest suite.

  2. Weeks 3-4

    Rough-in coordination for wet bar plumbing, appliance locations, electrical updates, projector wiring, theater lighting, bathroom fixtures, and gym needs.

  3. Weeks 5-7

    New flooring, wall and surface prep, theater feature wall work, wet bar cabinetry, bathroom tub-shower tile, vanity planning, and gym flooring.

  4. Weeks 8-10

    Countertops, wet bar appliances, drink fridge, backsplash, bathroom wallcovering, patterned floor tile, lighting, projector screen, and finish carpentry.

  5. Weeks 11-12

    Guest suite paint and pendant light, gym equipment placement, projector testing, final hardware, paint touchups, cleaning, punch-list work, and turnover.

PROJECT GALLERY

Open any image for a larger view.

MORE WORK

More projects to compare

NEXT STEP

Bring the right plan to your home

Tell us what you want to change, what isn't working now, and what kind of finished space you want to create.