Skip to main content
Blue basement bar island with white cabinetry, pendant lights, and seating

LENEXA, KANSAS

Basement Remodeling in Lenexa, KS

A finished lower level should make the house work better, whether that means a place to host, a room for family movie nights, a bathroom for guests, or storage that finally has a home. Built by Design plans the layout, selections, and construction together.

WE'VE BUILT HERE

Two Lenexa basements, built around the homeowners

Wet bar sink with blue cabinetry, white counter, and patterned tile backsplash

Bright bar, movie lounge, and bathroom

One project turned an unfinished lower level into a bright entertaining space with a custom bar, drink fridges, built-in storage, sports memorabilia displays, family movie seating, and a colorful bathroom.

Explore the Lenexa basement remodel
Vintage-inspired basement bar with stone fireplace wall and open game area

A vintage bar and game room with a point of view

The second project brought stored vintage art and decor into the design of a warm entertaining level with a wet bar, island seating, pool table area, movie-night lounge, fireplace, and new appliances.

Explore the vintage bar and game room
Finished basement lounge with seating, cabinetry, and layered lighting

START WITH THE BONES

Make room for what the house already has

A basement plan starts with a measured look at the ceiling, post locations, ductwork, mechanical equipment, plumbing stack, egress needs, and the way water behaves around the foundation. Those conditions don't disappear because a new layout looks good on paper.

We use them to set the room arrangement early. That gives the bar, bathroom, storage, lounge, or theater a place that works with the structure, and it gives the budget a real scope to respond to.

PLAN FOR REAL USE

Give the lower level more than one way to earn its space

The strongest basement plans separate the activities without making the space feel divided. A good layout lets a movie, game, drink, workout, and conversation happen at the same time without any one feature taking over the whole floor.

  • A place to gather

    Bars, lounge seating, games, and movie space work better when people can move between them without crowding the room.

  • A room with a job

    A bathroom, storage wall, or dedicated workout area gives the lower level a purpose on ordinary days, not only when company is over.

  • A finish that feels connected

    Lighting, flooring, cabinetry, and wall details carry the room from unfinished square footage to part of the house.

WHAT IT COSTS

Cost comes from the work behind the finishes

Finished basements from Built by Design have ranged from $80,000 to $550,000. Where a project lands depends on the layout, structural conditions, plumbing, mechanical work, and finish level rather than square footage alone.

Our guide to basement finishing cost in Kansas City explains the choices that move the number.

HOW WE START

Begin in the basement, with the people who use it

The first consultation happens at your home. We walk the lower level with you, talk about what needs to change, and see the conditions that shape the plan.

Then the design-build process brings layout decisions, selections, construction details, and cost conversations into one working plan before the project starts.

FAQ

Lenexa basement questions

Practical planning context for your project. Your project team confirms what applies after a walkthrough and written scope review.

What's the difference between basement finishing and basement remodeling?

Finishing turns unfinished square footage into living space for the first time. Remodeling reworks a lower level that already has finishes but needs a better layout, function, or design direction. Both need a plan that accounts for the home's structure and the way the space will be used.

Do I need an egress window for a finished basement?

A bedroom in a finished basement generally needs an emergency escape opening. That can mean an egress window and well, which affects excavation, layout, and cost. We sort that out before the floor plan is set.

Can you add a bathroom to a Lenexa basement?

Often, yes. The practical questions are where the plumbing stack sits, whether there is a rough-in, and what the floor and drainage conditions allow. Those details shape the layout and scope before selections begin.

How long does a basement remodel take?

Timeline depends on the starting condition, structural work, permitting, rough-ins, and the finish scope. One documented Lenexa basement remodel with a vintage bar and game room took 11 weeks, but every project gets its own schedule after the plan is clear.

Does Built by Design work on basements in Lenexa?

Yes. Our portfolio includes Lenexa Basement Remodel, an unfinished lower level turned into a bright entertaining space with a custom bar, drink fridges, built-ins, a family movie area, and a colorful bathroom. It also includes Lenexa Basement Remodel with Vintage Bar and Game Room, with a wet bar, island seating, pool table area, movie-night lounge, fireplace, and new appliances.

READY TO TALK?

Start with a walk through your Lenexa basement

Tell us what the lower level is now and what you want it to do next. We'll come to your home and start with the space you have.

Request Consultation